What are we best at? Electronics & 3D printing
Fast delivery 30-day returns
Own warehouse & service Thousands of products
15+ years of expertise 1.7M+ orders
What are we best at? Electronics & 3D printing
Fast delivery 30-day returns
Own warehouse & service Thousands of products
15+ years of expertise 1.7M+ orders

Over 500,000 customers already trust us. With us you get:

 

same-day shipping for products marked “24h shipping”

 

our own service centre in Poland

 

30 days to return and free delivery in Poland from PLN 500

 

4.9/5 on TrustMate and 4.9/5 on Google (almost 4,000 reviews)

 

VAT invoice, leasing and instalments for businesses

For businesses

 

individual quote for larger quantities

 

VAT invoice

For schools and universities

 

orders based on requests for quotation

 

help with choosing kits for your lab

Index: DNG-28671

Force sensor FSR - 2g-1.5kg - round 7.6mm - long leads

Round FSR force sensor 7.6 mm for pressure from 2 g to 1.5 kg, with long pins.

  • Resistance drops as pressure rises, read with an analog input
  • Detects pressure and its relative strength, not a replacement for a scale
  • Sensor only, with 2 pins; the divider resistor is sold separately
Price:
Net price:

This store sells to registered businesses only

Ordering on botland.store requires a verified business account with a VAT ID. Create one and we will confirm it shortly.

Your account is waiting for B2B approval

Ordering on botland.store opens once we have verified your company details. We will email you as soon as your account is approved.

Accessories Complete the set

Quantity

Over 500,000 customers already trust us. With us you get:

 

same-day shipping for products marked “24h shipping”

 

our own service centre in Poland

 

30 days to return and free delivery in Poland from PLN 500

 

4.9/5 on TrustMate and 4.9/5 on Google (almost 4,000 reviews)

 

VAT invoice, leasing and instalments for businesses

For businesses

 

individual quote for larger quantities

 

VAT invoice

For schools and universities

 

orders based on requests for quotation

 

help with choosing kits for your lab

Round FSR force sensor 7.6 mm up to 1.5 kg

This FSR force sensor with a round 7.6 mm sensing area detects pressure from 2 g to 1.5 kg. It is a thin-film force sensitive resistor: the harder you press it, the lower its resistance. You read it with an analog input of a microcontroller such as Arduino, in a voltage divider with one additional resistor.

A long, transparent tail with two tracks connects the sensing area to two metal pins, so you can place the area farther from the connection point. The underside is covered with adhesive tape protected by a paper liner, so you can stick the sensor to a flat surface. The sensor tells you whether something is pressing on it and roughly how hard, so it works as a pressure switch and a force indicator, not as a scale.

Force sensor FSR - 2g-1.5kg - round 7.6mm - long leads

Round 7.6 mm FSR force sensor with a long tail

Ø 7.6 mm

round sensing area

2 g-1.5 kg

force range according to the supplier

long tail

sensing area away from the connection

Force sensor FSR - 2g-1.5kg - round 7.6mm - long leads

Sensor from the sensing area side with its two pins

How does it work?

The sensor has two thin layers of film: one carries conductive traces, the other a layer that reacts to pressure. With no force applied, the circuit between the pins is open, and when you press the sensing area the layers come into contact and the resistance drops the more, the greater the force. The relationship between resistance and force is not linear, so sensors of this type are best suited to detecting pressure and judging its relative strength.

  • Connect one sensor pin to the 5 V or 3.3 V supply
  • Connect the other to an analog input, e.g. A0 on an Arduino, and through a resistor to ground (typically 10 kΩ)
  • Read the voltage with the analogRead() function: the harder you press, the higher the reading
  • Set the thresholds for light and hard pressure yourself by pressing the sensor in its final location

Is it the right choice for you?

A good choice if:

  • you want to detect pressure on a round 7.6 mm area away from the connection point
  • you expect pressure from 2 g to 1.5 kg
  • you are building a project with an Arduino or another microcontroller with an analog input

Consider another option if:

Frequently asked questions

Can I connect the force sensor to an Arduino?

Yes, but you need one more resistor. The sensor and the resistor form a voltage divider, and you connect the point between them to an analog input, e.g. A0.

Can I weigh an object to the gram with this sensor?

No. The resistance of sensors of this type changes non-linearly and varies between units. For weighing, choose a load cell.

When should I choose the version with long pins?

When the sensing area has to sit further from the connection point. The long tail with two tracks carries the signal without an extra wire at the sensing area itself.

Package contents

  • 1 x FSR force sensor 7.6 mm with long pins

Technical specification

ParameterValue
Typethin-film resistive force sensor (FSR)
Sensing area shaperound
Sensing area dimensionsdiameter 7.6 mm
Force range2 g-1.5 kg
Outputresistance decreasing with force
Pins2 metal pins, long tail with two tracks
Mountingadhesive tape on the underside
Name Value
Width 7 cm
Height 9.3 cm
Depth 0.3 cm
Weight 0.002 kg

Delivery method Delivery time Cost
GLS Shipping in 24 hours from €8.07

The full delivery terms are on the page Delivery and payment.

30 days to return, without giving a reason

If the product does not meet your expectations, you have 30 days from receiving the parcel to withdraw from the contract. The product only has to be complete. The right of return belongs to consumers (a purchase unrelated to business activity).

Complaints

If the product turns out to be faulty, you can make a claim under the guarantee or the statutory warranty. We handle claims without delay, at the latest within 14 working days of receiving the report together with the goods.

Be the first to ask a question about this product!

Instructions and documents

GPSR data

Country of origin China
Manufacturer contact details SHEN ZHEN YOU MAI KE TECHNOLOGY COLTD 2 Floor,C Building,Mingxin Industrial Park,No.28,Hualong Road Longhua District, Shenzhen, 518109 China Phone: 8617724681799
EU market introducer contact details BOTLAND B. DERKACZ SP. K. Gola 25A - 63-640 Bralin

Product information

This product is a component intended for further assembly or prototyping. It is not a finished product within the meaning of the product safety regulations.

Other customers also viewed

There are no reviews for this product yet.

Products from the same category

See all